WDP, the specialist in the construction of logistics warehouses, and Gosselin, the expert in international moving and logistics services, are embarking on an exciting adventure together: the construction of two new warehouses on the former Milcobel industrial site in Deurne. This site, extending over 6.5 hectares and located near the Gosselin container terminal, provides space for two state-of-the-art logistics warehouses of 18,000 m² each. For these new warehouses in Deurne, Winlock is providing the installation of 3 fire resistant sectional shutterswith a fire resistance of 60 minutes (EI1 60).